Today Was a Good Day to Lay Track

Just under a year ago, there was no layout in my house. Then, with a lot of help from my friends Ryan, Doug and Trevor, we built benchwork in a day last August. Today, I had a work session booked with friends to work on tricky bits of the layout with many hands and for me to learn things from people with more experience than I have in layout construction, so that I get myself set up to be able to make more progress myself when time permits.

The first task of my day was a quick run to Home Depot to pick up a few pieces of trim lumber. I finally figured out how to get some decent lighting into the closet and the CPR Parkdale Yard staging yard. I made a valance board that is installed onto the shelf using baseboard lattice trim, and glued around the metal shelf frame using No-More Nails caulk adhesive. Then, using a supply of self adhesive LED Strip lights leftover from the set we bought for our kitchen cabinets, I installed a strip of the lights behind the valance. Now, there is ample light for working in staging, and for anyone operating there to see what they are doing. An easy couple of hours of solo work which made wiring in the closet so much easier (didn’t make the space any bigger, but made it brighter at least!).

 

 

 

 

The two pictures show the new valance board clipped onto the shelf railing while the glue cures, and the second shows the lights on and working and brightening up the staging yard.

Today, I had two friends, Dan and Trevor coming over to help. Both are experienced modellers, and Dan built all the switches for the layout, including the monstrous Bat’leth of track that fills one whole corner of the benchwork that Dan built. It needed some final adjustments before laying, and then filling in the pieces to connect the switches up Mowat Avenue from the staging yard to the first corner of the layout. It took time, but Dan’s meticulous and super skilled, and he was able to make minuscule adjustments to track and locomotives/freight cars that had them running far better than I have managed.

When Trevor arrived, we set to work on installing the layout power bus, the main wire that gets connected to the DCC control station and then to all the individual pieces of track. For the bus, we used 14 gauge speaker wire, its big enough to carry a lot of power and info, but easy to work with, and already paired. Using plastic mounting bases, that you connect zip ties into, the wire is loosely held for now beneath the benchwork but the zip ties can be pulled tight once the work is done to keep the wiring from moving once all the slack is taken out as I move along the layout and connect wiring from each of the pieces of track.

Once the bus wire was run around the room, we (and by we mostly Trevor if I’m being honest!) started to connect the track at the west staging, and figure out how we would wire the sliding traverser shelves so there was enough slack for the shelves to move, but not so much that it would hang or not work.

 

 

 

 

Trevor working on the less sexy part of layout building, the wiring, but its super important to make a layout run.

Dan built all the individual switches using Fast Tracks jigs and supplies, but before we could install them, one in particular, a large combination piece with five switches and two crossovers we called the Bat’leth because of its resemblance to the Klingon weapon on Star Trek needed some little cleanups and testing with my rolling stock before it could be glued down. Between some fine filing on the points, replacing and adjusting wheels on locomotives and freight cars, equipment now seems to run flawlessly through the switches. With that, we could move on drilling holes for the switch throw bars and the frog wires to drop through the benchwork. After sorting out all the bits of track that go between the Bat’leth and the walls, we were in a position to apply a layer of DAP Alex Clear caulk and get the track glued down into position.

 

 

 

 

Trevor works on wiring the west staging traverser, while Dan works on adjustments to the switches he built for the layout. On the right, the Bat’leth is now adjusted and glued down in its corner of the layout curing.
Proof I did some work thanks to Trevor. A picture of me working on my soldering skills, and on getting the track glued down and aligned with Dan.

With the day’s work winding down, we had some fun testing that the wiring actually worked, and that I could control a locomotive on both ends where the track is connected, and not short out or blow anything up. After today’s work, about 1/3 of the “visible” track that will have scenery is installed is glued down, and when timer permits, I can move on with installing wiring drops and laying more bits of track. As usual at the end of a good work session, we were stopped by both the time of day, and the running out of supplies!!

 

 

 

The First powered test on the CPR Staging, running over the layout bus (main wiring line) from my ESU Lokprogramer at the other end of the room. Means everything we wired (mostly by Trevor) was done right!

 

Trevor brought his O-18a, a locomotive which would have been very at home in Liberty Village. The video is a short test on the CNR Staging at the end of the day.

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )