Peninsular Musings

I’ve written about the peninsula for my layout in passing in posts, and at least one post on mocking it up, but now that I’ve been living with it mocked up since April (4 months), I now have a good feel on what I do and don’t like about it. I like that I’ve gotten it down to a size where it does what I need it to for the layout, but where it isn’t so big that it completely blocks traffic in the room. I don’t like how small the room feels when the peninsula is in place but nothing is happening. When I took the peninsula down for the wiring and tracklaying to proceed last weekend, I walked into the room and went wow its a bigger room without the peninsula, not necessarily the response I wanted.

IMG_7814Peninsula mockup before trimming it down.

My original plan had been for it to be hinged and swing over to the front of the benchwork to free up space. Over the four months I’ve had the mockup in place, I’d been coming around to having it be permanently mounted, but having taken it out now, I know that would be the wrong decision. Keeping it movable, even just swinging it around is necessary to open up the room for a whole variety of reasons. because of the buildings on the peninsula, I don’t want it to be completely removable as then I’d be constantly having to take the buildings off and put them somewhere else, having it hinged and swinging away does the best of both worlds, easy to store, and opens up the space.

June 07 18 - Liberty Layout - West.anyExtract of the Track Plan showing the slimmed down 22″x40″ Peninsula

The peninsula will swing to the right of the plan above, so that it would be against the benchwork between Jefferson and Atlantic when its stowed. In working on the trackwork, its also become clear that I need to actually build the peninsula benchwork sooner rather than later, even if I don’t permanently install it, just to support the track and get the alignment right. I have a few ideas on how to do the hinge and alignment pins to make sure that the benchwork and track always align and hold in space when it is put in position for operating.

IMG_9205Flying trackwork, this needs a peninsula badly to let me finish making sure this trackage works when complete both on the main benchwork and the peninsula.

I want to get the trackwork and scenery on the wall mounted benchwork done and finished before I start working on the peninsula in earnest, but I can build it, get the track in place, and take it down, or who knows, maybe once its in place, I’ll be happy its there and be able to work around it. While I putter away at the trackwork in the coming weeks, I’m going to think about when I can do the woodwork to build the simple box and legs so I can have it in place for a bit, then take it down to finish the phase 1 construction of the layout.

IMG_9236My printed survey showing the footprints of the buildings on the peninsula, and the roughed in track lines. Just waiting for a wood box framework to get installed.

So, its continued progress, slow and steady. I know now how I want to handle the peninsular, and doing it hinged to start, its easier to change my mind and go permanent later, rather than going hinged as decisions like casters on the legs are now a must rather than an option.

One thought on “Peninsular Musings

Leave a Reply

Fill in your details below or click an icon to log in:

WordPress.com Logo

You are commenting using your WordPress.com account. Log Out /  Change )

Twitter picture

You are commenting using your Twitter account. Log Out /  Change )

Facebook photo

You are commenting using your Facebook account. Log Out /  Change )

Connecting to %s